GGuniyo

About Guniyo

Most families build a house once. They should know what it will cost, what material goes into it and whether a contractor's quote is fair — before the first brick. Guniyo works that out the way a site engineer does, item by item, and gives it away free.

KA

Founder

Kunal Alonkar

Civil engineer · Civil Engineer · 12+ years in civil engineering and valuation · Chhindwara, Madhya Pradesh

Civil engineer and valuer. Valuer, Indian Institution of Valuers (IIV), Pune, Membership No. Cat-I/F-7426.

Why I built it

I am a civil engineer with more than 12 years in the field. I worked in a job for the first 5 years, then became a contractor and took government contracts, where I worked as the estimate engineer: measuring the work, making the BOQ and checking the rates.

Again and again I saw house owners pay too much, or get stuck midway, because nobody had shown them the item-wise cost before they started. The calculators here are built from that site and estimating experience. I wanted every owner to have the same working that an engineer uses.

Disclaimer: The calculators and estimates are built from my experience and standard Indian practice. They are for planning and budgeting only. Actual quantities and costs depend on your design, soil, site, material and local rates, and can differ. They are not a structural design, a valuation report or a sanctioned drawing. Before you build or buy, get the drawings and the final BOQ checked by a registered engineer or architect, and use your own quotes. Guniyo and its author are not liable for decisions made only on these estimates.

How the numbers are made

  • Plans come from a planning engine that places rooms to scale, keeps the stair and walls in line floor over floor, and checks every room has a door, light and air. It is tested on 1,680 plot sizes on every change.
  • Estimates are item-wise BOQs measured from the plan — excavation, concrete, steel from a bar bending schedule, brickwork, plaster, flooring, doors, windows, services — priced at 2026 market rates.
  • Quantities follow standard Indian practice (IS 456, IS 1200 methods of measurement, NBC minimum room sizes). Every calculator shows its working so you can check it.

What Guniyo is not

It is not a structural design or a sanctioned drawing. Use the plans and estimates to plan, budget and talk to your architect and contractor — then get the drawings signed by a registered professional and passed by your local body.

Contact us →

Results are preliminary estimates based on standard thumb rules and the inputs given. Final quantities come from drawings and a detailed BOQ. Structural sizes and reinforcement must be checked by a qualified engineer.