Building Permission, Setbacks and FAR for a House
Step 2 of 7 · Every city's building bye-laws decide how much of the plot you may build on and how high. Ask the local body or your architect for the exact figures.
Setbacks are the open strips you must leave around the house — in front, at the back and on the sides. They decide the real size of each floor: a 30 × 50 ft plot with 5 ft in front, 3 ft at the back and 3 ft on each side leaves only 24 × 42 ft to build on.
FAR (floor area ratio, also called FSI) caps the total floor area of all floors together. With an FAR of 1.5 on a 1,500 sq ft plot you may build 2,250 sq ft in total — that is what limits the number of floors, not the strength of the columns.
The figures differ from city to city and change with the road width, so take them from your local body's bye-laws or your architect. Build only after the map is passed; an unapproved floor can be sealed, and it blocks the completion certificate, the permanent connections and a resale.
Checklist
- Setbacks — the open space to leave in front, at the back and on the sides (depends on plot size and road width).▶ Watch videos on YouTubeWork it out →
- Ground coverage and FAR / FSI — how much floor area in total you may build; this caps the number of floors.▶ Watch videos on YouTube
- Building permission (naksha pass) before you start: drawings signed by a registered architect or engineer.▶ Watch videos on YouTube
- Temporary power and water connection for construction; rainwater harvesting where the bye-laws ask for it.▶ Watch videos on YouTube
- Completion / occupancy certificate at the end — needed for the permanent connections and for a resale.▶ Watch videos on YouTube
Common mistakes
- Covering the front setback with a room or a slab to gain space.
- Getting a G+1 map passed and building G+2.
- Forgetting the completion certificate, then struggling for the permanent power and water connections.