Terrace waterproofing and roof finishing: layers, slope and the water test
Stage 10 of 14 · About 1 to 2 weeks, plus the test
A leaking terrace is one of the most common complaints in new houses, and it is almost always a workmanship problem, not a bad-luck one. The cure is a good slope, one good membrane and a water test you witness.
Be present when the water test starts and ends, and photograph the ceiling below.
What you need to know
Water must leave the terrace on its own. Give a slope of roughly 1 in 100 to 1 in 50 towards the outlets using a screed or brickbat coba, and make sure no pocket is left where water can stand.
The common layers, from the slab upwards, are: a cleaned slab, a sloping screed, the waterproofing membrane (cementitious, liquid or sheet), a protective screed, and then tiles or a finish. Ask the applicator for the product name and the number of coats in writing.
Take the membrane up the parapet wall by a proper height, and seal around pipes, outlets and the edge of the water tank base, because most leaks start at corners, joints and pipe penetrations.
A parapet is usually about 1 m (3 ft) high, but check your local bye-laws. Fix rain water pipes of enough size, with a clean outlet at every low point and a mesh to stop leaves from blocking them.
Before any tile goes on, do a ponding test: block the outlets, flood the terrace with about 50 mm of water and leave it for 48 hours. Check the ceiling below for any damp patch or drip, and mark the water level at the start and the end.
Get a written warranty for the waterproofing, with the number of years and what it covers, and keep the bills of the material.
Check this before you move on
- Slab is clean and any cracks are filled before the work starts
- Slope towards every outlet; no pockets where water can stand
- Membrane goes up the parapet and around pipes and the tank base
- Product name, coats and thickness are as agreed, with the empty containers shown
- A 48-hour water test is done before the protective screed or tiles
- Ceiling below is checked and photographed after the test
- Rain water outlets are clear, with a mesh
- Written warranty and material bills are in your file
Common mistakes
- Applying the membrane on a dirty or damp slab, so it does not stick
- No slope, so water stands and finds the first crack
- Laying tiles before the water test
- Skipping the corners and pipe joints, where leaks begin
- A one-line verbal promise instead of a written warranty
Watch how it is done
Search YouTube for site videos of this stage in Hindi: Open YouTube search
Tools for this stage
Make my item-wise BOQAll 14 stages
Frequently asked questions
Which waterproofing is best for a terrace?
No single product is best everywhere. Cementitious and liquid-applied coatings, and bitumen or polymer sheet membranes, all work when the slab is prepared well, the slope is right and the edges are sealed. A good applicator, a written warranty and the water test matter more than the brand.
How long should the water test run?
A common practice is to hold about 50 mm of water for 48 hours, with the outlets blocked, and then check the ceiling below. Some specifications ask for 72 hours. Do not skip the test to save two days.