House handover: snag list, final bill and completion certificate

Stage 14 of 14 · About 2 to 4 weeks, plus the defect period

The house is only finished when the papers are finished too. A careful handover protects you from paying for work not done, and keeps the right to have every defect fixed.

Do not release the final payment or the retention until the snag list is closed.

What you need to know

Walk through the house with your engineer and the contractor, room by room, with a written snag list: leaks, cracks, loose tiles, doors that rub, dead switches, slow drains, paint marks. Test every tap, switch, flush and lock. Agree a date by which each item is fixed.

Take the final measurement against the BOQ or agreement, and pay the final bill only for work done. Keep the retention (often about 5 percent) until the defect liability period ends, usually 12 months.

Collect all drawings (architectural, structural, electrical, plumbing) and ideally marked-up copies of how it was actually built, the warranty cards, the cube test reports, the bills of main materials and the contact details of every trade.

Apply for the completion (or occupancy) certificate from the local authority, where it is required, and then for the permanent electricity and water connections. A bank loan and a later sale often need these papers.

Update the property tax record for the new building, insure the house, and keep a simple maintenance routine: clean terrace outlets before every monsoon, and service the tank, pump and electrical board once a year.

Check this before you move on

  • Written snag list signed by you and the contractor, with dates
  • Every tap, switch, flush, door and lock tested
  • Final measurement matches the BOQ or agreement; extras were in writing
  • Retention held back until the defect period ends
  • All drawings, warranties, test reports and bills are in one file
  • Completion or occupancy certificate applied for, where required
  • Permanent electricity and water connections applied for
  • Property tax updated and house insured

Common mistakes

  • Paying the full bill before the snag list is cleared
  • Moving in before the completion certificate, then facing a bank or sale problem
  • Not collecting the drawings and photos, which makes later repairs a guess
  • Releasing the retention early

Watch how it is done

Search YouTube for site videos of this stage in Hindi: Open YouTube search

Tools for this stage

Make my item-wise BOQ

All 14 stages

Frequently asked questions

What is a snag list?

A snag list is a written list of small defects and unfinished work found when you inspect the finished house, such as a cracked tile, a door that rubs or a leaking tap. The contractor fixes each item, and you tick it off before the final payment.